Fusion Worldwide News & Insights - Read Online Today

DDR3L authorized lead time reaches 39 weeks on MT41K256M16TW-107; DDR4 prices up sharply

Written by Andrew Czuczwa | 10.19.2026

DDR3L authorized lead time reaches 39 weeks on MT41K256M16TW-107; DDR4 prices up sharply

FindChips reports a 39-week authorized lead time on Micron MT41K256M16TW-107, names the MT41K as a last-time-buy candidate, and suggests ISSI and Nanya as second sources. TrendForce reports Q1 2026 DDR4 prices up to 50% with DDR3 in tight supply; Wccftech reports DDR4 prices over 50% in Q3 2026 with DDR3 also higher.

Long-lived industrial, networking and medical designs on DDR3L/DDR4 should plan last-time buys and qualify second sources now, before lead times and prices rise further.